So where are we? I’ve lost track already. This whole thing has turned into a jam!
Before the drywall goes up, there were some electrical issues to take care of. Took about two days of full work, but ended up stretching across the whole week. Some interjections occurred along the way, including the need for extra heater duct, the decision to put a light bulb in every closet, some basic rewiring off Breaker 1, and a badly cut finger that required emergency medical attention. But hey, we’re here, right? And it’s not even mid-September yet.
Tomorrow, Sunday, we’re gonna hang the drywall. I’m meeting Mike at Home Depot to pick stuff up tomorrow at the unthinkable 7am. A long physical day. I’ll be needing a massage next week.
Most of the recent work has been done under the hood, so there’s not a whole lot of change to be seen. But for now, here’s the first test look at the back cans. In there now are cheap incandescents, to be replaced by directional halogens on dimmers. Still on the To Do list is to address the lighting situation between the soffit and the beam. Those decisions begin tomorrow.